A Virtual Cab Ride
Our transport for the ride.
Awaiting the "right away"
Chinnor Hill Road Bridge
Approaching Donkey lane
Top of the bank
Out into the country
Wainhill crossing ahead
Beyond Wainhill Crossing
West Lane Bridge
Approaching Horsenden Crossing
The Guard opening the gates at Horsenden
Thame Junction
End of the line (until we extend to Risborough)
Thame branch on the right
Stiff climb out of the cutting
Again the gates are opened
The run to Bledlow
The Chiltern hills as a back drop
One the many foot crossings on the line
West Lane Bridge
Approaching Wainhill
Wainhill Crossing. Gates are manned.
Up the 1 in 66 bank to Chinnor
Final stretch.
Station road bridge ahead.
Signalled in by the flagman.
Slowing to halt in the platform.
Journey's end.